Bouvier Bay Apartments
August  2001 Progress Photos

November 2001 Move In


trans9x9.gif (1588 bytes)

 April 00 |  May 00  |  June 00    |  December 00  |  January 01   February 01  |   March 01 
April 01 | May 01   |  June 01  |  July 01  |  August 01  |  September 01  |  October 01  |  November 01  |  December 01

trans9x9.gif (1588 bytes)

8_20_mike_john.jpg (26814 bytes)

John and Mike are smiling as they prepare to apply the final square foot of basecoat.

8_20_building_front.jpg (18981 bytes)


8_19_foam.JPG (17910 bytes)

Ducts are insulated with a urethane foam.

8_19_livingrom.JPG (16345 bytes)

Exterior walls are 2"x6" and insulated with R19.

8_9_rc_channel.jpg (22169 bytes)

Common walls between apartments constructed to be sound proof.   First the wall was built with a 2"x6" plate with staggered offset 2"x4" studs.  R11 acoustic insulation was applied to both sides of the wall.  On one side RC channel was attached to the studs to isolate sheet rock from studs.  Finally, on one side of the wall is two layers of 5/8" drywall and on the other side is one layer of 1/2" drywall. 

8_19_foyer2.JPG (22752 bytes)

Foyer walls are insulated with R11 acoustic insulation.

8_20_stairs_3.JPG (17193 bytes)


8_20_stairs.JPG (18288 bytes)


8_20_stairs_2.JPG (15726 bytes)


8_20_stairs_4.jpg (14023 bytes)


8_20_livingrm2.JPG (12051 bytes)

8_19_working.JPG (13270 bytes)

8_20_livingrm3.JPG (15762 bytes)

8_15_livingrm_kitchen.JPG (11574 bytes)

8_20_foyer.JPG (19649 bytes)

8_20_control_joint_caulked.jpg (7779 bytes)

8_20_window_joint_not_caulked.jpg (11842 bytes)


8_20_window_joint_caulked.jpg (11019 bytes)


Bouvier Bay Apartments  | Construction Photo Index |   www.cliffbelleau.com